Ben Han Haiguang news correspondents reported in recent days, even drop heavy rainfall in Hainan, large area flood disaster occurred in some areas of stagnant water 10 year, Hainan power grid company organized to cope with, and ensure the safety of electrical equipment, power system is operating normally.
according to the Hainan-style publication data show, October 11, 18 cities and counties are greater than 100 mm of rainfall in Hainan, 8 cities and counties over 300 mm of rainfall, tunchang County 504.6 mm, 9 cities and counties of 217 villages in the whole province was flooded.
flood threat to power equipment safety. 12th 110,000 volt bonded by Haikou power supply company storm water from drains flooding on duty found in time, starting station pumps and emergency call 4 pumps to the pumps, control dangerous situations in a timely manner. 13th Ting company 35,000 volts nanlihu station wall collapsed 40 meters, the device functional. In addition, other lines and power supply facilities are up and running.
response to storm attack, Hainan power grid company timely publication of the wind-proof work of flood control emergency notification, calling on all power supply company and doing a storm flood prevention work, and emergency release yesterday heavy rain information requires companies affected by the strong rains tight deployment, enhanced preparedness, do well the work of flood control water log control.
the last few days, Hainan power grid company paying close attention to power system operation and daguangba and two hydropower stations in Songtao reservoir water level changes, timely to ask power network base station equipment and personnel to patrol the low-lying substations and power equipment, 24-hour a day monitoring. At the same time, the company’s centralized organization of spare parts and equipment and materials, organizations established line repair team, rushing around the support work at any time, effective prevention against heavy rains girls party dresses for electric power facilities, minimizes the loss.
from Hainan Province electric power dispatching Center was informed that the heavy rain did not have an impact on electricity supply, Hainan power grid running smoothly.
November 30, 2011
Hainan fancy dress ball power actively dealing with storm disaster in
Uhvdc converter station master of engineering equipment supervision party dress manual are being published
On May 20,short cocktail dresses the State grid Corporation of UHV construction planning, organization, State grid DC Engineering Construction Ltd is responsible for compiling the uhvdc converter station master of engineering equipment supervision manual are being published by China electric power press.
of uhvdc power transmission in China is the first time, their equipment at home and abroad will be free from off-the-shelf practical design and manufacturing experience. UHV equipment can smoothly through various inspection and test, ensuring high quality delivery on schedule, matter of uhvdc demonstration project of construction of the big picture.
for seriously implementation device prison made concentrated management of requirements, strengthening DC transmission engineering device manufacturing quality of prison made intensity, ensure in special high pressure main device manufacturing process in the compromise to implementation production technology standard, to quality hidden eradication in products factory zhiqian, in national grid company unified deployment Xia, DC prison made representative punishable by to-Shang special high pressure DC engineering device manufacturing for relying on, for special high pressure DC engineering device varieties more, and number large, and production cycle long, and Site wide, supervision of participants and more features, based on the standardization of uhvdc equipment supervision, program-building, scientific analysis, precise planning, after the last six months of hard work, finally completed the codification uhvdc converter station master of engineering equipment supervision Guide.
the manual under including for flow transformer peace wave reactance device under, and Crystal gate tube for flow valve under, and DC control protection system under three a fascicles, covers has from device design review, and manufacturing, and test to save stack of full process prison made process, provides has to-Shang ± 800kV special high pressure DC transmission demonstration engineering technology specification, and test project and specific parameter. The manual by considering the actual conditions of the factory and on-site supervision of officers of the force, taking into account the commonality of uhvdc engineering equipment supervision and supervision, manufacturing content between the two sides, with strong operational and indicative.
the publication of the manual, supervision officers complete control all phases of the work equipment supervision key points of content, procedures, and requirements, raising the level of standardization of supervision is of great significance for further upgrading of uhvdc converter station master of engineering equipment supervision and management and implementation capacity and lay a solid foundation for. The Handbook provides supervision experiences of great reference value, both as primary equipment supervision of uhvdc project officer work instructions for carrying out supervision work, but also for other outlines, detailed rules for the supervision of engineering supervision to provide reference for the preparation of and for use by staff learn about to enter the ranks of the supervision.
November 29, 2011
Heilongjiang electric power company OPPC optical ball gowns evening dresses phase cable optical cable in the 110,000-volt line application filled the domestic blank
On December 7, Heilongjiang Hegang electric power Bureau OPPC application of optical phase cable optical cable in the 110,000-volt line officially starts, that work will be addressing in the construction of the smart grid, 110,000-volt lines without overhead ground wire cable problem could not be installed, but also fills up the domestic OPPC optical phase cable optical cable in the 110,000-volt line blank.
most of domestic 110,000 volt transmission line using optical fiber composite ground wire fiber OPGW fiber optic communication technology, 23.2 km in this 110,000-volt replacement on the Toho-line c in Nantong City transit communications company party dresses uk produces LGJ-150/25-wire, OPPC is optical phase conductor cables at home without first used in overhead ground wire on a 110,000 volt transmission line. The technology when applied, not only increased the amount of electric power communication channel, also enable real-time monitoring of power line temperature changes, and can accurately measure the position of power line breakpoint, better for the construction of safe production, power management and future smart grid communications platform provides broad. (Yu Sheng Sang Xueyong)
Shandong electric power group and the ICBC Shandong Shandong China UnionPay sign cooperation agreement celebrity dresses tariff
On June 5, the Shandong company and Shandong provincial branch of the industrial and commercial bank (ICBC Shandong) branch of Shandong province, China UnionPay (Cup in Shandong province) in the collection of electricity charges was held in Jinan’s business cooperation agreement signing ceremony, marking the cooperative tripartite collaboration will further deepen the silver, and in more areas and at a higher level, achieve mutual benefit and win-win situation. Signing of the agreement, helps companies further strengthen and Shandong, Shandong industrial and commercial bank of business cooperation, and make full use of Shandong UnionPay electronic platform, with the help of bank cards, online banking, self-service banking and other means, for electricity customers with self-service payment, withholding pre-payment fees, four types of electricity, counter payment collection service, assist of the corporate collection of electricity charges in the province of Shandong aggregate.
the signing ceremony, Shandong company says business cannot develop without financial support. In recent years, under the strong support of ICBC, China Union pay, company and Shandong, Shandong industrial and commercial bank, Shandong UnionPay financing loans, settlement, money, aggregate, collection of electricity charges in areas such as, the establishment of a broad, harmonious and effective partnership. Particularly in terms of power supply service, jointly launched the banking card credit card payment, self-service payment, online payment, and other new multimedia terminals, fast service means to meet the service needs of different customer groups, greatly facilitate the masses, winning wide praise. This sign tariff agreement, full use of silver electrical expertise, service, network advantage, further expanding the way electricity charges paid, not only for the masses provides a more flexible, convenient and efficient service, and the collaboration of silver onto a higher level.
Shandong company and Shandong ICBC signed this times generation received tariff agreement, is in 2007 both signed of cooperation agreement Foundation Shang for has supplementary and improved: a is refinement has payment way prom dresses 2014 description, clear has procedures fee standard; II is added has Bank side multimedia terminal self-help payment, and electronic bank, and power side business Hall POS machine, and power side self-help sales electric Terminal POS payment, new payment means ; Three is clear of Shandong acquiring bank ICBC Shandong UnionPay layout POS machine; four is to refine the breach between the two sides. For General Electric customers card consumer demand, Shandong branch in the second half of 2008 cooperation with Shandong China UnionPay and arrangement in Jinan power supply company as a pilot unit emplaced in Hall 17 POS machines and using serial port mode to achieve synchronization transaction information and marketing support systems. Pilot run, currently has a promotion conditions in the province. (Gao Lilian Cheung Chi-wai)
Jiangsu electric power company for provincial power evening gowns uk grid control integration
At noon on June 28, Jiangsu power dispatching control center the realization of the block 25 kV transformer substation centralized monitoring of the whole province. This marks the Jiangsu company “run” in the construction of the formal completion of the construction of provincial power grid control integration.
the “run” system construction, optimized integration company Jiangsu company power grid dispatch and equipment resources, promote centralized monitoring business transformation equipment operation and the provincial, prefectural, and County (with) three-level power grid dispatching business combination, thus achieving “controlling integration”. According to Jiangsu company calculation, all voltage grade variable electric device run concentrated monitoring business respectively into corresponding grid scheduling unified management Hou, scheduling member can directly gets grid accident and device state information, by integrated analysis judgment Hou, may immediately in scheduling Taiwan on variable electric device implementation remote control operation, fast processing grid accident, and adjustment grid run way, turn effective reduced work links, shortened accident processing time, significantly improve grid scheduling emergency reaction ability and power supply protection ability.
the 500,000-volt transformer substation centralized monitor from the organization structure, monitor staff selection and training, duty place modification, system process preparation of perfect, perfect system to the official technology platform to support reconstruction work, a total of six. Within six months, carding systems company in Jiangsu Province. Among them, of the dispatching automation system of substation monitoring access management requirements of the standardized the next 500,000 volt transformer substation infrastructure, replacement of equipment, equipment maintenance, and other circumstances “four remote” signal access or adjustable monitor system in “four remote” signals a change management process. Revised operation regulations of the Jiangsu power dispatching control monitor (proposed) then become adjustable monitor important basis and guidance of watchkeeping personnel to conduct production.
uniform requirements in accordance with the State power grid company, Jiangsu company combining the actual situation of development and technological progress of Jiangsu power grid, developed a scheduling internal institutions at all levels, jobs and staffing standards, clear post-level standards, units and corporate systems, selecting the matching the 28 provinces 500,000 volt regulation monitoring and operating personnel. Meanwhile, according to city and County power supply company business adjustments, optimization, County (with) two-level scheduling agency professionals. It is learnt that the company in Jiangsu Province establish very strict to raise 500,000 volt monitoring posts, monitor is longer, monitoring positive, monitor position pursuant to determine posts such as Deputy examination results, accomplishments and experience in the implementation of comprehensive evaluation in peacetime, enroll only those who are outstanding.
for the new monitoring team can quickly meet the post requirement, Jiangsu company evening gowns uk dedicated to the 2 issues a total of 66 days “run” system of business knowledge. 500,000-volt transformer substation site theory in the training set and the province in two parts. Also organized the Jiangsu power grid during power failure plan management tuning, operation management of Jiangsu power system communication system 7 lectures, effectively increases new monitoring staff skill levels. (Zhang Jian)
November 27, 2011
Northeast power . grid company in welders full professional skill competition success
On November 2, the contest in Dalian in Northeast China grid company limited in welders full vocational skills training center successfully came to an end. This competition, the company human resource Department Organization for the harmonization, hydropower management company, security and other departments of supervision, the supervision, the Working Committee of the Department actively coordinate the professional skill appraisal assessment of Dalian training center and weld training center made careful arrangements to guarantee the smooth progress of the competition.
this competition in two phases: first phase of theoretical knowledge and skills actions written in various hydropower plants established test centers, a total of 55 players from the grass-roots units took part in the first round of the first round. Skills of the second phase of operation contest in Dalian training center on November 2, after a first round selection, from hydroelectric power plant of the company system before the written test score of 20 players took part in the quarter-final.
after a day of highly contested race, final fengman, Yunfeng power plant groups, second. Sun Weiyan of Taiping Bay power plant company in welders full professional skill competition first prize, and won the “technology champion” . honorary title of fengman power plant of Hongtao Wang Feng Yan, baishan power plant 5 people who have been race in the second, third, and won the “technical experts” honorary title of baishan Hongtao Wang was the first name, won the “skills action winners” honorary title. Competition to a Grand recognition of the award-winning units and players.
this competition not only gives contestants a compete skills, presentation skills, enhance competitive platform, at the same time, but also for the Northeast electric welding workers ‘ overall quality of an inspection of the company. Through skills competitions to further inspire and mobilize the enthusiasm of the broad masses of staff knowledge, science technology, created an emphasis on skilled workers, good atmosphere of respecting knowledge and talented people. (Yang Suli, and Pan Wei)
November 26, 2011
Fujian Vice . Governor Li Chuan and Ouyang Sheng-British General Auditor talks
On January 26, national grid company General Auditor Ouyang Sheng-British trip to Fujian, on behalf of the State power grid company and Fujian Vice Governor Li Chuan met with and held cordial and friendly talks, the two sides in power grid construction, such as smart grid, energy exchange of views and come to a consensus. Fujian Provincial Development and Reform Commission, State economic and Trade Commission, provincial price Bureau, head of Fuzhou electric power supervision Office, Fujian company leader LI Weidong, Cheng Zhanglei, and responsible persons of relevant departments of the company accompanying the talks.
Li Chuan, Vice Governor of the OU-Yang sheng-British line represents the national grid companies come to see Fujian party group thanks, he said, State grid Corporation Fujian has been very concerned about and support, he represented the provincial party Committee and provincial government thanks the national grid company. He pointed out that the 2009 economy get better grades in Fujian province, almost all economic indicators have surpassed the goals set out at the beginning, in the process of economic and social development, the power has played a very important role, closely related to power and social power effectively guarantee the sustained development of the province’s economy, effectively guarantee the social production and living of the population. Now the province’s electricity installed capacity reaches sanqianduowanqianwa, power generation in the province last year when the amount exceeds 100 billion-kilowatt, Fujian completely said good-bye to the power of tension. Vice Governor Li said Fujian province electric power company is a management, very orderly, and on the economic and social development of Fujian enterprises have made outstanding contributions. He pointed out that, national support Fujian speed up construction Straits West Bank economic zone of several views introduced Hou, Fujian inevitable usher more large of development, this year is Fujian full implementation sea . west development planning of first years, Fujian maximum of pressure is development of pressure, therefore, Fujian urgent need national and ministries of support, power is Fujian province of important industry one, Fujian also urgent need national grid company of support, hope national grid company in Fujian of investment further increased, intelligent grid also in Fujian first carried out, But also in economic and social development in Fujian province electric power company can make a bigger, more contributions.
Ouyang Sheng-British, said her trip was in accordance with the requirements of the State grid Corporation of leading party group and General Manager of Liu ya Dong, thank the Fujian Provincial CPC Committee and Government over the past year for State grid Corporation Fujian province electric power company, and support for the work of. She said that on the national grid company, was a tough year last year, under the influence of the world financial crisis, the national grid system of electricity dropped very large, grid systems to stand out to be a severe test. She said, last year to, Fujian company get has provincial, and provincial Government of vigorously support, grid construction Shang success implementation has 500,000 v large ring network, and East China grid power replacement Shang made new progress, in electric price adjustment Shang get has provincial government and related sector of support, makes Fujian province power company has has sustainable development ability, province sales power in April by negative regularized, all these are cannot be separated from the provincial, and provincial government and at all levels local Government of concern and support. She said, in new of a years in, national grid company also will do Expo power supply, while vigorously development special high pressure grid and intelligent grid construction, and electric vehicle, new energy of development, Fujian grid of construction task also still heavy, hope Government, as always, support national grid company and Fujian province company of work, while grid company also will, as always, to strengthening service power customer, and line wind, aspects work, fight for do was better.
Fujian company General Manager LI Weidong on provincial, and provincial government and province development and Reform Commission, and province economic and Trade Commission, and province prices Council, and Fuzhou electric prison Office, sector said thanks, he said, in past of a years in, Fujian province power company by made of results are got to has province in all aspects of full support, he said, Fujian province power company in work in the has do was bad, and does not of local, urge provincial, and provincial government more given criticism and guidance.
after the talks, the British Vice Governor Li Chuan and Ouyang Sheng also give each other gifts, express gratitude to each other for a long time working on the support and help. (Dongsheng Wu)
November 25, 2011
North China grid company . leadership to ultra high pressure the company to inspect and guide the work of Beijing
On March 17, Zhao Yuzhu, Deputy General Manager of North China power grid and his entourage arrived in Beijing high pressure Jiang Jia Ying to inspect and guide the work of the company.
staff briefed Zhao Yuzhu on the basic conditions of station and stations made a detailed report on the operation mode and load. Zhao Yuzhu carefully asked the station’s “two sessions”, and was briefed on the company’s recent Tianjin Zhuang Wu, Hebei hengshui two misoperation accident experience reports, and so compliance reporting line preparation for specific measures. Finally, Zhao Yuzhu accompanied by related personnel in the company came to the room equipment zone, protection of anti-misoperation locking devices for on-site inspections.
Zhao Yuzhu in the checks on the . North Super company of the “two sessions” and “too the subject line” prepare affirmed, requires strengthening daily equipment inspections, hoping North hyper-informed the company personnel to conscientiously study and analysis of accidents, over, draw lessons from accidents, further raising the level of equipment operation and maintenance to ensure safe, reliable and stable power supply. (Sun Lianbao)
November 24, 2011
Gansu province electric power . company to host fourth workers ‘ sports meeting three competitive events across the province
The morning of May 23, undertaken by Gansu province electric power company of the province’s fourth worker Games chess competition began. The same day, coming from all over the State and city in the province, the Central and local enterprises of the 27 teams, nearly staff player, liujiaxia gymnasium in Gansu company took part in the game.
with the 2008 . Beijing Olympic Games draws near, the th staff sports meeting in Gansu province in the midst of an intense and orderly. This workers ‘ sports meeting was intended to “welcome the Olympics, heavy involvement, strong body, promoting harmonious, more progress”, organised by the Federation, Gansu Provincial Sports Bureau of Gansu province. To demonstrate the style of the Gansu electric power workers, promoting the network enterprise further development of sport and physical activity, companies actively involved in the activities of Gansu province, hosting Chinese chess, bridge and go three events. On April 28, the fourth worker games opening ceremony in the province, Gansu company 40 people square banners and 120 people dance troupe the dancing of the holding up the Sun, strong praise from the audience. Zhihou, power in Gansu province sent 7 representatives of trade unions, more than 80 employees Trade Union players, respectively, competing for Chinese chess, table tennis, badminton, bridge, swimming, tennis and chess competitions.
source: Gansu province electric power company
November 23, 2011
Carefully prepared in Liaoning province and power . booster first Liaoning aviation Sports Festival
As the first Liaoning aviation Sports Festival is approaching, in order to ensure the safety of aviation during the Festival, stable, reliable power supply, on August 1, Liaoning company close preparation for the implementation of conservation measures, to ensure power supply foolproof.
for successfully completed this times movement section insurance electric task, Liaoning company height attention, carried out has related coordination work, set up has “aviation movement section” insurance electric special work group, held insurance electric coordination will, developed has careful detailed of insurance electric programme, careful arrangements, ahead of on important arenas power supply of line and the device for has full of Xiao deficiency, timely elimination various defects; check spare spare parts prepared situation, guarantee staff in emergency repair work is being urgently Shi spare spare parts can timely in place ; Strengthening equipment inspections implemented 24 hour personnel, vehicles, communication flow.
it is reported that Liaoning air sports festival will be held on September 2 in Yingkou, Liaoning, which is northeast of aviation Sports Festival for the first time, at which time there will be a comprehensive weddings, airplane performance, party night ‘ hot air balloon, the air hot air balloon Flying children drawing competition, and so on.
Liaoning company said Kone, do a good job during the match, additional “national grid”. brand image. (Li Jinbiao)